I'm now 5.5" down the body of Na Craga and it is taking a lot longer to work one round. The two major twist rows take me 30 minutes to complete. Still enjoying the process and the sweater is going to be very striking. The cables really pop in the Cascade 220. I have now used up the 6th skein.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment